Forthcoming Roadworks in the Ealing Area
Closures and diversions which may cause problems

Lane Closures on North Circular Near Chiswick Roundabout to Resume
Work on improving Gunnersbury Avenue safety to last through to Summer
Pitshanger Lane, Ealing |
27 March — 27 March |
Delays likely Traffic control (two-way signals) |
Works description: SEWER S81 EMERGENCY--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GZYJ--000002 |
|
Pitshanger Lane, Ealing |
27 March — 27 March |
Delays likely Traffic control (two-way signals) |
Works description: SEWER S81 EMERGENCY--WORKS INTENDED TO INCLUDE FIRST TIME PERMANENT REINSTATEMENT WITHIN SAME PHASE |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141GZYJ--000001 |
|
A40 Western Avenue, Perivale |
25 March — 27 March |
Delays likely Lane closure |
Works description: Access required to Underground BT structure to restore service - No structural changes. Work being carried out on existing BT Plant on job number IBY251RY |
Responsibility for works: Openreach |
Current status: Planned work about to start |
Works reference: BC005CC1W0025MARIBY251RY |
|
B455 South Ealing Road, Ealing |
25 March — 27 March |
Delays likely Traffic control (multi-way signals) |
Works description: JOINT HOLE AND TRENCH TO BOUNDARY FOR NEW SUPPLY |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP551S30002730 |
|
Murray Road, Ealing |
25 March — 02 April |
Delays likely Road closure |
Works description: Consequential damage in carriageway |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU026002141FGSF--001001 |
|
B4491 Popes Lane, Ealing |
18 March — 24 May |
Delays likely Traffic control (multi-way signals) |
Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE |
Responsibility for works: Scottish and Southern Power Distribution |
Current status: Planned work about to start |
Works reference: LP705S30001052 |
|
A406 Gunnersbury Avenue (north Circular Road) |
15 March — 29 March |
Delays likely Lane closure |
Works description: Works to reinstate the eastern footway of the A406 Gunnersbury Avenue over the Power Road Bridge. Works will require a Lane 1 SB for a safety zone. Works coordinated with the Gunnersbury Safety Scheme Phase 2. TM 24/7 |
Responsibility for works: Transport for London |
Current status: Planned work about to start |
Works reference: YG400402049 |
A4000, A40 Western Avenue, Acton |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342348 |
|
Westway, Hammersmith and Fulham |
27 February — 23 September |
Delays likely Road closure |
Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432342350 |
|
March 26, 2019
|