Forthcoming Roadworks in Acton


Road and lane closures in the W3 area likely to lead to traffic problems

The following roadworks are likely to cause some delays in the Acton area:

One Lane Of The Westway To Be Closed For Several Months
Work on cycle lane between Acton and Wood Lane likely to cause delays

Roadworks in Acton

A4000,A4020 High Street, Acton

17 April — 19 April

Delays likely  Traffic control (two-way signals)

Works description:  LAY DUCT IN FOOTWAY AND CARRIAGEWAY TO CONNECT CLIIENT

Responsibility for works:  VIRGIN MEDIA

Current status:  Planned work about to start

Works reference:  NK100/SCLJBU/115241/LSM

A4000,A40 Western Avenue, Acton

17 April — 18 April

Delays likely  Lane closure

Works description:  CARRIAGEWAY REPAIRS

Responsibility for works:  Transport for London

Current status:  Planned work about to start

Works reference:  YG430375725

A406,A4005 Hanger Lane, Ealing

18 April — 20 April

Delays likely Lane closure

Works description: 27/010 - 105166 - slot cut c/w sensor loops to repair traffic signals SD5 repair feeder plus feed to existing chamber, 22.00-05.00, southbound c/w swapping lane 1 & 2 and f/w to chamber (ped access maintained)

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG515S000000002286

B490 Acton Lane, Acton

17 April — 25 April

Delays likely  Traffic control (multi-way signals)

Works description:  new water supply. HH 349, P1/2, 2x25mm MDPE mtrd Supply. Works infoot way and in Carriageway. Our intention is to complete the PermanentReinstatement in the same phase

Responsibility for works:  THAMES WATER

Current status:  Planned work about to start

Works reference:  MU307000808402520045-002

Cobbold Road

16 April — 03 May

Delays likely Road closure

Works description: Thames Water/IWJS need to carry out works on the water valve and pumping station. A Road Closure will be installed to allow these works to be carried out. No Excavation.

Responsibility for works: THAMES WATER

Current status: Advanced planning

Works reference: MU101WO-COBBP0ZZ/IWJS/01

Westway

16 April — 17 April

Delays likely Road closure

Works description: BLOCK CLOSURE WB# TESTING LIGHTS & BOLLARDS, BULK CLEAN & CHANGE, SWEEPING, GULLY & BEANY BLOCK CLEANING, BARRIER WORKS, GRASS CUTTING, SIGN CLEANING, DEBRIS PATROLS

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG431348437

A4000,A40 Western Avenue, Acton

08 April — 18 May

Delays likely  Lane closure

Works description:  P2 N1902530 IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way

Responsibility for works:  Transport for London

Current status:  Planned work about to start

Works reference:  YG432368144

Cobbold Road

09 April — 25 April

Delays likely Road closure

Works description: Thames Water/Bridges need to carry out works on the water valve. A Road Closure will be installed to allow these works to be carried out. No Excavation.

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU101WO-COBBP0ZZ/B

B4491 Popes Lane, Ealing

18 March — 24 May

Delays likely Traffic control (multi-way signals)

Works description: EXCAVATE TRENCH INSTALL CABLE CARRY OUT JOINTING BACKFILL AND REINSTATE

Responsibility for works: Scottish and Southern Power Distribution

Current status: Planned work about to start

Works reference: LP705S30001052

A4000,A40 Western Avenue, Acton

18 March — 28 September

Delays likely Road closure

Works description: IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Planned work about to start

Works reference: YG432331357

Westway

18 March — 18 November

Delays likely Road closure

Works description: IPP Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432368104

Westway

18 March — 18 November

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432366318

Westway, Hammersmith and Fulham

27 February — 22 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342350

A4000, A40 Western Avenue, Acton

27 February — 23 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432342348

A4000,A40 Western Avenue, Acton

28 January — 29 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432329945

Westway

28 January — 29 September

Delays likely Road closure

Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required

Responsibility for works: Transport for London

Current status: Advanced planning

Works reference: YG432329946

April 16, 2019