Forthcoming Roadworks in Acton
Road and lane closures in the W3 area likely to lead to traffic problems
The following roadworks are likely to cause some delays in the Acton area:

East Acton Lane, Acton |
05 December — 11 December |
Delays likely Traffic control (two-way signals) |
Works description: 1x25mm MDPE new water meter supply in f/way and in Carriageway. Ourintention is to complete the Permanent Reinstatement in the same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000807932050045-001 |
|
A4000 Horn Lane, Acton |
12 December — 14 December |
Delays likely Traffic control (multi-way signals) |
Works description: carry out a non intrusive Subsurface Utility Mapping Survey. |
Responsibility for works: Ealing |
Current status: Planned work about to start |
Works reference: DV00866000270 |
|
B4491,A4000 Gunnersbury Lane, Acton |
11 December — 12 December |
Delays likely Traffic control (two-way signals) |
Works description: syrinx leak detection. No excavation, chamber opening only. |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600CHB1789-6 |
|
B4491,A4000 Gunnersbury Lane, Acton |
11 December — 12 December |
Delays likely Traffic control (Stop/Go boards) |
Works description: Syrinix Equipment maintanence - Chamber opening only. Non excavation |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU600CHB1790-7 |
|
B490 Acton Lane, Acton |
12 December — 14 December |
Delays likely Traffic control (two-way signals) |
Works description: Excavation - Temporary 2 way signals in place to allow excavation for Cabineet installation - Some carriageway incursion - 2 way signals with full chapter 8 signage -pedestrians to be maintained using the walkway behind the work area |
Responsibility for works: Vodafone |
Current status: Planned work about to start |
Works reference: NX04171892-RTS-CW |
|
Park Parade, Acton |
10 December — 14 December |
Delays likely Road closure |
Works description: new customer water supply 1x32mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase |
Responsibility for works: THAMES WATER |
Current status: Planned work about to start |
Works reference: MU307000807735730100-001 |
A406 Gunnersbury Avenue (north Circular Road) |
24 November — 22 February |
Delays likely Lane closure |
Works description: Phase 1a - 4 Utility works, drainage and re-profiling works. |
Responsibility for works: Transport for London |
Current status: Advanced planning |
Works reference: YG432334046 |
|
December 11, 2018
|