Notification of imminent roadworks in the area
A40/A4000 Western Avenue, Acton, Ealing | ||
17 July — 18 July | ||
Delays likely Lane closure | ||
Works location: A40/A4000 | ||
Works description: Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closures With Offside Lane Running - All Vehicle Movements Maintained Eb 2300 To 0500 Slip No Nw12-0316 | ||
Responsibility for works: Transport For London | ||
Current status: Advanced planning |
A40/A4000 Western Avenue, Acton, Ealing | ||
17 July — 18 July | ||
Delays likely Lane closure | ||
Works location: A40/A4000 | ||
Works description: Cpp Block Closure Wb# Testing Lights& Bollards, Bulk Clean & Change, Sweeping, Gully & Beany Block Cleaning, Barrier Works, Grass Cutting, Sign Cleaning, Debris Patrols Nearside Lane Closures With Offside Lane Running - All Vehicle Movements Maintained Wb 2300 To 0500 Slip No Nw12-0316 | ||
Responsibility for works: Transport For London | ||
Current status: Advanced planning |
A40/A4000 Western Avenue, Acton, Ealing | ||
18 July — 22 July | ||
Delays possible Some carriageway incursion | ||
Works location: A40/A4000 | ||
Works description: Replace 1 Jointbox Frame And Cover(S) (725mm X 225mm) In Footway | ||
Responsibility for works: BT | ||
Current status: Planned work about to start |
A4000 High Street, Acton, Ealing | ||
17 July — 18 July | ||
Delays possible Some carriageway incursion | ||
Works location: A4000 | ||
Works description: Blocked Tee In Footway For New Residential Supply. | ||
Responsibility for works: Virgin Media | ||
Current status: Planned work about to start |
B490 Acton Lane, Acton, Ealing | ||
17 July — 21 July | ||
Delays possible Some carriageway incursion | ||
Works location: B490 | ||
Works description: Gs(Iu)R Cut Off - Gas Service Disconnection With Excavation Under Ourmandatory Obligation To Comply With Gas Safety Regulations 1994. Excavate, Disconnect Domestic Gas Supply And Reinstate | ||
Responsibility for works: National Grid Gas Plc | ||
Current status: Planned work about to start |
B490 Winchester Street, Acton, Ealing | ||
17 July — 21 July | ||
Delays possible Some carriageway incursion | ||
Works location: B490 | ||
Works description: Carry Out Installation Of Boundary Box In Footway In Footway. Ourintention Is To Complete The Permanent Reinstatement In The Samephase | ||
Responsibility for works: Thames Water | ||
Current status: Planned work about to start |
East Acton Lane, Acton, Ealing | ||
18 July — 21 July | ||
Delays possible Some carriageway incursion | ||
Works location: - | ||
Works description: - | ||
Responsibility for works: BT | ||
Current status: Planned work about to start |
A40 Old Oak Common Lane, Acton, Ealing | ||
17 July — 21 July | ||
Delays unlikely Some carriageway incursion | ||
Works location: A40 | ||
Works description: Locate And Excavate 1 Blockage In Existing Duct | ||
Responsibility for works: BT | ||
Current status: Planned work about to start |
|
||||||||||
|
||||||||||
|
||||||||||
17th July 2014